LA INDIA

Agnico-Eagle Dates: 2012 - 2013 Location: Sonora, Mexico 17,250 TPD - Heap Leach

KCA completed detailed engineering and fast-track EPCM for 17,250 tonne per day 3-stage crushing plant, field-conveyor stacking system, and heap leach facility. The project was completed in 13 months.  In addition to the EPCM contract, KCA provided the recovery plant, including a 1400 m3/h CIC circuit, and a 7-Tonne Zadra Strip Circuit with Refinery.